CN202745807U CN201220321325.6U CN201220321325U CN202745807U CN 202745807 U CN202745807 U CN 202745807U CN 201220321325 U CN201220321325 U CN 201220321325U CN 202745807 U CN202745807 U CN 202745807U
Authority
CN
China
Prior art keywords
well
oil pressure
protection device
remote control
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201220321325.6U
Other languages
Chinese (zh)
Inventor
卢涛
韩兴刚
梁博羽
王惠
冯朋鑫
徐文龙
王晓荣
马海宾
谷成义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201220321325.6U priority Critical patent/CN202745807U/en
Application granted granted Critical
Publication of CN202745807U publication Critical patent/CN202745807U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

本实用新型公开了一种井口远控调节紧急切断保护装置,是为实现气田气井开关作业的数字化管理、提高劳动效率及降低运行成本的目的而设计的,井口可调节紧急截断阀设在气井管线上流量计和上游油压之间,同时连接下游油压。上游油压、下游油压、流量计及井口可调节紧急截断阀均联接智能开关井控制器,智能开关井控制器依托无线传输装置联接计算机平台。当本保护装置后油压超过或低于设定压力时,保护装置能自动关闭,实现自动保护性关井。无论上游油压多高,保护装置均可实施远程控制自动调节开井。本保护装置可进行实时快速地远程控制自动开关井,而且,远程控制和手动控制可相互切换,大幅提高劳动效率,降低劳动强度,减少运行成本,实现气田气井开关的数字化管理。

Figure 201220321325

The utility model discloses an emergency shut-off protection device for wellhead remote control adjustment, which is designed for the purpose of realizing the digital management of gas well switch operations in gas fields, improving labor efficiency and reducing operating costs. The wellhead adjustable emergency cut-off valve is arranged on the gas well pipeline Between the upper flow meter and the upstream oil pressure, connect the downstream oil pressure at the same time. The upstream oil pressure, downstream oil pressure, flow meter and adjustable emergency cut-off valve at the wellhead are all connected to the intelligent switch well controller, and the intelligent switch well controller is connected to the computer platform relying on the wireless transmission device. When the oil pressure behind the protection device exceeds or falls below the set pressure, the protection device can be automatically closed to realize automatic protective shut-in. Regardless of how high the upstream oil pressure is, the protection device can implement remote control and automatically adjust the opening of the well. The protection device can perform real-time and rapid remote control of automatic well opening and closing, and the remote control and manual control can be switched to each other, greatly improving labor efficiency, reducing labor intensity, reducing operating costs, and realizing digital management of gas well opening and closing in gas fields.

Figure 201220321325

Description

Well head is far controlled and is regulated the emergency cut-off protective device
Technical field
The utility model relates to a kind of well head and far controls adjusting emergency cut-off protective device, belongs to gas field gas well switch well operations technical field.
Background technology
Along with the exploitation of Soviet Union's Sulige gas field, the switch well operations of gas well is increasing, and particularly intermittently the increase of gas well makes the switch well operations of gas well very frequent, and workload is very large.At present, the well remote control switch technology of gas field field by using is without regulatory function, and the operation that can not drive a well still needs manually-operated, and workload is large and operation is untimely, and efficient is lower.
Summary of the invention
The purpose of this utility model is to provide a kind of well head far to control and regulates the emergency cut-off protective device, and it can realize the digital management of gas field gas well switching operations, raises labour efficiency, and reduces running cost.
Concrete technical scheme of the present utility model is as follows:
Well head can be regulated urgent block valve and be located on the gas well pipeline between the flow meter and upstream oil pressure, and simultaneously, well head can be regulated urgent block valve and connect the downstream oil pressure.Upstream oil pressure, downstream oil pressure, flow are taken into account well head and can be regulated urgent block valve and all connect intelligent switch well controller, and intelligent switch well controller relies on radio transmitting device to connect computer platform.
When oil pressure behind this protective device surpasses or is lower than setting pressure, protective device energy autoshutdown, protection downstream line system realizes automatic protectiveness closing well.No matter how high the upstream oil pressure is, and this protective device all can be implemented automatic adjusting of Long-distance Control and drive a well.This protective device can carry out real-time Long-distance Control automatic switch well, and Long-distance Control and manual control can be switched mutually, significantly increase work efficiency, and reduce labour intensity, reduce running cost, realize the digital management of gas field gas well switch.
Description of drawings
Fig. 1 is that well head is far controlled the connection schematic diagram of adjusting emergency cut-off protective device on the gas well pipeline.
The specific embodiment
With reference to Fig. 1 embodiment of the present utility model is further specified:
Embodiment:
Well head can be regulated urgent block valve 1 and be located on the gas well pipeline between the flow meter 7 and upstream oil pressure 5, and simultaneously, well head can be regulated urgent block valve 1 and connect downstream oil pressure 6.Upstream oil pressure 5, downstream oil pressure 6, flow meter 7 and well head can be regulated urgent block valve 1 and all connect intelligent switch well controller 2, and intelligent switch well controller 2 relies on radio transmitting device 3 to connect computer platform 4.
When Long-distance Control drives a well, computer platform 4 relies on radio transmitting device 3, urgent block valve 1 forward and backward upstream oil pressure 5 and downstream oil pressure 6 be can regulate by 2 pairs of well heads of intelligent switch well controller and information gathering and intelligent comparison judgement carried out, and then control and regulate well head and can regulate urgent block valve 1 opening, when treating that upstream pressure is down to setting value, drive valve and open fully, realize that Long-distance Control drives a well.
During the Long-distance Control closing well, computer platform 4 relies on radio transmitting device 3, can regulate urgent block valve 1 by intelligent switch well controller 2 driving well heads and close, and realizes the Long-distance Control closing well.
During the self-shield closing well, downstream oil pressure after well head can be regulated urgent block valve 16 surpasses or when being lower than setting pressure, the valve autoshutdown, and protection downstream line system realizes the ultra under-pressure defencive function.

Claims (1)

1. a well head is far controlled and is regulated the emergency cut-off protective device, it is characterized in that:
Well head can be regulated urgent block valve (1) and be located between flow meter on the gas well pipeline (7) and the upstream oil pressure (5), and simultaneously, well head can be regulated urgent block valve (1) and connect downstream oil pressure (6); Upstream oil pressure (5), downstream oil pressure (6), flow meter (7) and well head can be regulated urgent block valve (1) and all connect intelligent switch well controller (2), and intelligent switch well controller (2) relies on radio transmitting device (3) to connect computer platform (4).
CN201220321325.6U 2012-07-04 2012-07-04 Well head remote control adjustment emergency cut-off protection device Expired - Fee Related CN202745807U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220321325.6U CN202745807U (en) 2012-07-04 2012-07-04 Well head remote control adjustment emergency cut-off protection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220321325.6U CN202745807U (en) 2012-07-04 2012-07-04 Well head remote control adjustment emergency cut-off protection device

Publications (1)

Publication Number Publication Date
CN202745807U true CN202745807U (en) 2013-02-20

Family

ID=47705224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220321325.6U Expired - Fee Related CN202745807U (en) 2012-07-04 2012-07-04 Well head remote control adjustment emergency cut-off protection device

Country Status (1)

Country Link
CN (1) CN202745807U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196501A (en) * 2014-03-03 2014-12-10 陕西延长石油(集团)有限责任公司研究院 Automatic production allocation system for high and medium pressure gas fields
CN107780885A (en) * 2016-08-24 2018-03-09 中国石油天然气股份有限公司 Method and device for intelligently switching on and off well
CN109555892A (en) * 2017-09-26 2019-04-02 中国石油化工股份有限公司 Pipeline cutting device long-distance monitoring and alarming control system
CN110905444A (en) * 2019-11-22 2020-03-24 中国石油天然气股份有限公司 Gas well remote pressure control and adjustment quick-break device and application method thereof
CN113833434A (en) * 2021-09-28 2021-12-24 四川省威沃敦化工有限公司 Remote intelligent control device and method for gas production at wellhead

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196501A (en) * 2014-03-03 2014-12-10 陕西延长石油(集团)有限责任公司研究院 Automatic production allocation system for high and medium pressure gas fields
CN104196501B (en) * 2014-03-03 2017-01-25 陕西延长石油(集团)有限责任公司研究院 Automatic production allocation system for high and medium pressure gas fields
CN107780885A (en) * 2016-08-24 2018-03-09 中国石油天然气股份有限公司 Method and device for intelligently switching on and off well
CN107780885B (en) * 2016-08-24 2020-05-08 中国石油天然气股份有限公司 Method and device for intelligently switching on and off well
CN109555892A (en) * 2017-09-26 2019-04-02 中国石油化工股份有限公司 Pipeline cutting device long-distance monitoring and alarming control system
CN110905444A (en) * 2019-11-22 2020-03-24 中国石油天然气股份有限公司 Gas well remote pressure control and adjustment quick-break device and application method thereof
CN110905444B (en) * 2019-11-22 2023-07-25 中国石油天然气股份有限公司 Remote control pressure regulating emergency breaking device for gas well and application method thereof
CN113833434A (en) * 2021-09-28 2021-12-24 四川省威沃敦化工有限公司 Remote intelligent control device and method for gas production at wellhead

Similar Documents

Publication Publication Date Title
CN202745807U (en) Well head remote control adjustment emergency cut-off protection device
CN106869856A (en) Natural gas well head remote intelligent switch control device
CN105952456B (en) A kind of adaptive abrasive material slurry jet flow mining system and method
CN106869874A (en) The device that a kind of remote control natural gas well is opened and closed
CN106677521A (en) Formworks for concrete pouring and with an atomizing device and storehouse surface temperature controlling system applying same
CN201925144U (en) Automatic control device of mine water pump
CN204942710U (en) A kind of Novel back pressure valve automatic flat opening device
CN202109616U (en) Energy-saving control device for ground source heat pump central air-conditioning system
CN205740444U (en) A kind of new automatic reverse osmosis water treatment system
CN202612163U (en) Fan variable frequency speed control system based on programmable logic controller (PLC)
CN201107590Y (en) Intelligent Control System of Spray and Dust Removal in Fully Mechanized Mining Face
CN202432066U (en) Hydraulic valve body with temperature control system
CN208996124U (en) Surmount pipe voltage operated device water circuit system
CN204005254U (en) A kind of novel lime slurry pipe controller
CN206571460U (en) Natural gas well head remote intelligent switch control device
CN113445971B (en) Oil field water injection energy-saving scheme and pipe network working condition simulation calculation method
CN2816344Y (en) Well mouth safety valve control device
CN203718823U (en) Gas safety protection system for gas-fired boiler
CN202431247U (en) Hydraulic control system for blowout preventers of snubbing operation device
CN202091602U (en) Electromagnetic control valve for water sprinkler
CN201800718U (en) Mining cableway hydraulic driving system with speed limiting protection device
CN204153467U (en) The energy-conservation traffic demand control gear of thermal power plant's compressed air system
CN204026156U (en) The outer defeated pressure sledge of a kind of rock gas
CN202582230U (en) lead melting equipment
CN202786294U (en) Automatic purging device for glasses valve

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130220

Termination date: 20210704